GEO D10/Sub Rigging
GEO D10 and GEO SUB rigging/interconnect schemes minimize mechanical variables. Deploying as an easy-rig system the systems easily fly, without motor hoists, from two weight-dependent compression crank options. Stage stacking is another common and usually venue-dependent deployment option. Under NS-1 array designs and even without a dedicated down-fill component, integrated D10 and GEO SUB systems provide precise and nearly infinite vertical coverage control options. Horizontal coverage can be used adjusted at 80º or 120º.
The GEO D system bumper and external rigging hardware apply a decade of rigging experience with the acclaimed Crossbow and GEO S and GEO T systems, while custom wheelboards simplify transport. GEO D10 inter-connect employs two robust AMPHENOL EP6 6-pole socket connections, one each for signal IN, and signal THROUGH. GEO SUB connects via twin NL4MP SPEAKON connectors.